Colour & CraftPainters & decorators — Twickenham & London, since 2000 · archive

What to Do When the Builders Have Finished

Colour & Craft no longer trades under this domain, and none of the painting, decorating, bathroom, handyman or refurbishment work described here can be booked through this site. These pages are kept only as a record of what the company published between 2010 and 2015. If you're looking for a tradesperson now, see where to find help.

Home › Blog › What to Do When the Builders Have Finished

The original article at this address was not preserved in the web archive. Below is new editorial content on the same topic.

Project completion is not the moment to relax—it's when careful inspection ensures everything meets your expectations and that workmanship can be corrected before contractors leave site. New work, particularly painting or structural changes, requires attention in the weeks after completion to identify and address any issues.

Final Inspection and Snagging

Before paying final invoices, inspect all completed work carefully. Create a list of any issues—uneven paint application, damage, incomplete work, poor finishing details. These are "snags" that should be corrected at no additional cost as part of the contract. Don't accept "we'll fix it later"; get work completed and inspected before final payment.

Be fair in your assessment; minor cosmetic variations are normal, but poor workmanship shouldn't be accepted. Clear photos of problems aid discussion and resolution.

Paint Care in Early Weeks

New paint shouldn't be washed or scrubbed for at least two weeks as it cures fully. Moisture (from showers, cooking) can mark fresh paint initially; ventilation and drying time resolve this. If problems appear—staining, adhesion failure, pattern visible under paint—contact your decorator immediately. These issues are easier to address fresh than weeks later.

Structural Work

New plasterwork, pointing, or structural repairs may take weeks to stabilise. Fine hairline cracks often appear as work settles; these typically stabilise and are minor concerns. Larger cracks, water staining, or separation warrant contractor review. Architects or structural engineers can assess whether issues are normal settlement or indicate problems.

Warranties and Guarantees

Reputable contractors offer warranties on their work (typically one to five years depending on type). Retain documentation of warranties. If problems arise within warranty periods, you have recourse for repair or replacement.

Documentation

Keep all invoices, contracts, warranties, and photographic records. These prove work quality for future house sales and form records for tax purposes if work qualifies as home improvements.

Post-project diligence ensures you enjoy quality work for years to come.